SFU Applied Sciences Building (ASB) Renovation Project
Status: Under construction
Project Location: Simon Fraser University, Burnaby, British Columbia, Applied Sciences Building Levels 9000 and 10000
Details: FWS Construction LTD formwork contract includes seismic upgrades, architectural feature concrete walls and columns.
SFU Applied Sciences Building (ASB) Renovation Project




Project Info
The ABS renovation adds 900 square meters of space to the north side of the 9000 and 10000 levels. Creating shared innovation spaces to showcase work of students, and to foster collaboration within Faculty of Applied Sciences (FAS) students and community. Providing a welcoming entrance that connects the east and west side of the SFU campus and supports future development of adjacent area.
Client: Chandos
FWS Expected Completion Date: Summer, 2021
Project Type: Institutional Concrete Formwork
FWS Construction LTD SFU Applied Science Building renovation Gallery
Matt FWS Construction LTD Concrete FormWork Contractor; “FWS Construction LTD formwork contract includes seismic upgrades, architectural feature concrete walls and columns.” as seen in the project construction photo gallery.
FWS Construction LTD Instagram Feed
FWS Construction LTD SFU Stadium Gallery
Matt FWS Construction LTD Concrete FormWork Contractor; “What makes this project a challenge is the intricate design of the precast panel connection details with corbels, embeds and anchor bolts.” as seen in the project construction photo gallery.
FWS Construction LTD Instagram Feed
Other Projects
Commercial
Prospect Point
For City of Vancouver
Institutional
SFU Stadium
For Simon Fraser University
Residential
Town Homes
Arne by Mondevo Development